Rate Notice: 5.9% general rate increase Jan 1, 2026 — Learn More
    concrete drill

    concrete drill

    concrete drill Freight

    About this Product

    Concrete drills require secure shipping with protective packaging to prevent damage during transit. Use durable materials like bubble wrap or foam inserts for cushioning, and ensure proper stacking to avoid stress on chucks.

    Product Specifications

    • Material: Concrete
    • Size Options: Varies
    • Load Capacity: High
    • Coating: None
    • Applications: Construction and masonry
    • NMFC Code: 103070 (suggested)
    • Freight Class: TBD

    Note: All specifications listed are suggested values.

    Why UNIS?

    Concrete drills are durable and benefit from secure, stable shipping. UNIS handles these items efficiently with protective packaging and proper handling to ensure safe transportation.

    Shipping Methods & Advantages

    LTL freight

    Best for 1–3 units or smaller batches that do not require a full truck.

    FTL freight

    Ideal for 5+ units or bulk shipments headed to large retail warehouses.

    Air freight

    Fastest option for urgent deliveries or time-sensitive placements.

    Reefer freight

    Recommended when the shipment includes temperature-sensitive contents.

    Reliable Transport

    Dedicated handling keeps fragile products secure throughout transit.

    Nationwide Network

    Coverage across major markets for consistent delivery windows.

    Timely Deliveries

    Optimized routing reduces delays and keeps inventory on schedule.

    Quality & Security

    Protective packaging and checks minimize damage risk.

    concrete drill additional view

    Need to ship concrete drill?

    Get a quote today and let UNIS handle your concrete drill freight with safe, secure, and timely delivery.

    Handling & Compliance

    HTS Official Website

    Access official HTS information for import/export compliance.

    Visit Resource

    UNIS HTS Codes

    Review HTS codes for concrete-related materials.

    Visit Resource

    Dimensions & Weight (Packaged)

    Ensure proper storage dimensions: minimum 100 sq ft, 8 ft height clearance.

    Visit Resource

    Handling Requirements

    Store in dry, well-ventilated areas. Use pallets (48" height) or adjustable shelving.

    Visit Resource

    Packaging Specs

    Protect drills with bubble wrap or foam. Store on sides to minimize chuck stress.

    Visit Resource

    Accessorials

    Require 12" loading dock width and 10" door opening for efficient access.

    Visit Resource

    Cost Drivers

    Freight costs depend on volume, distance, and packaging. Contact for detailed pricing.

    Visit Resource
    UNIS support representative

    Ready to ship?

    Get a free quote or start shipping your concrete drill freight today.

    Shipping FAQ

    Common questions we get across freight uses.

    ← Back to Cutting Tool Storage