Rate Notice: 5.9% general rate increase Jan 1, 2026 — Learn More
    cement paint

    cement paint

    cement paint Freight

    About this Product

    Cement paint requires dry, well-ventilated shipping conditions to prevent premature drying. Use sturdy, padded containers and secure pallets to avoid damage. Ensure proper ventilation to manage fumes.

    Product Specifications

    • Material: Cement-based compound
    • Size Options: Varies
    • Load Capacity: 500 lbs
    • Coating: Water-resistant
    • Applications: Masonry repair
    • NMFC Code: 130340 (suggested)
    • Freight Class: TBD (suggested)

    Note: All specifications listed are suggested values.

    Why UNIS?

    Cement paint is typically shipped in bulk containers, requiring secure, dry transport. UNIS offers reliable handling for heavy, fragile materials with proper padding and ventilation.

    Shipping Methods & Advantages

    LTL freight

    Best for 1–3 units or smaller batches that do not require a full truck.

    FTL freight

    Ideal for 5+ units or bulk shipments headed to large retail warehouses.

    Air freight

    Fastest option for urgent deliveries or time-sensitive placements.

    Reefer freight

    Recommended when the shipment includes temperature-sensitive contents.

    Reliable Transport

    Dedicated handling keeps fragile products secure throughout transit.

    Nationwide Network

    Coverage across major markets for consistent delivery windows.

    Timely Deliveries

    Optimized routing reduces delays and keeps inventory on schedule.

    Quality & Security

    Protective packaging and checks minimize damage risk.

    cement paint additional view

    Need to ship cement paint?

    Get a quote today and let UNIS handle your cement paint freight with safe, secure, and timely delivery.

    Handling & Compliance

    HTS Official Website

    For customs classification details, visit the HTS database.

    Visit Resource

    UNIS HTS Codes

    Find specific HTS codes for cement paint and compliance requirements.

    Visit Resource

    Dimensions & Weight (Packaged)

    Minimum 150 sq ft storage area with 12ft height clearance. Ensure level floors and avoid moisture-prone zones.

    Visit Resource

    Handling Requirements

    Secure containers with padding to prevent damage. Use proper lifting techniques and avoid dropping. Maintain stable stacking up to 4 pallets high.

    Visit Resource

    Packaging Specs

    Pallet storage with shelving units rated for 500 lbs. Ensure clear visibility for inventory management.

    Visit Resource

    Accessorials

    Require 10ft loading dock width and 8ft door clearance for equipment access.

    Visit Resource

    Cost Drivers

    Freight costs depend on container size, weight, and handling complexity.

    Visit Resource
    UNIS support representative

    Ready to ship?

    Get a free quote or start shipping your cement paint freight today.

    Shipping FAQ

    Common questions we get across freight uses.

    ← Back to Dry Material Storage