Rate Notice: 5.9% general rate increase Jan 1, 2026 — Learn More
    sub panel

    sub panel

    sub panel Freight

    About this Product

    Sub panels require secure, organized shipping to maintain durability and prevent damage. Proper packaging, labeling, and stacking methods ensure safe transport and efficient handling.

    Product Specifications

    • Material: Metal (suggested)
    • Size Options: Varies (suggested)
    • Load Capacity: 500 lbs (suggested)
    • Coating: Powder-coated (suggested)
    • Applications: Industrial electrical systems (suggested)
    • NMFC Code: 129050 (suggested)
    • Freight Class: Class 125 (suggested)

    Note: All specifications listed are suggested values.

    Why UNIS?

    UNIS offers secure, organized storage solutions ideal for sub panels, ensuring safe handling and efficient logistics. Their adaptable systems support bulk storage, protect equipment, and streamline order fulfillment.

    Shipping Methods & Advantages

    LTL freight

    Best for 1–3 units or smaller batches that do not require a full truck.

    FTL freight

    Ideal for 5+ units or bulk shipments headed to large retail warehouses.

    Air freight

    Fastest option for urgent deliveries or time-sensitive placements.

    Reefer freight

    Recommended when the shipment includes temperature-sensitive contents.

    Reliable Transport

    Dedicated handling keeps fragile products secure throughout transit.

    Nationwide Network

    Coverage across major markets for consistent delivery windows.

    Timely Deliveries

    Optimized routing reduces delays and keeps inventory on schedule.

    Quality & Security

    Protective packaging and checks minimize damage risk.

    sub panel additional view

    Need to ship sub panel?

    Get a quote today and let UNIS handle your sub panel freight with safe, secure, and timely delivery.

    Handling & Compliance

    HTS Official Website

    Access official HTS classification guidelines for sub panels. (link: https://hts.usitc.gov/)

    Visit Resource

    UNIS HTS Codes

    Review HTS codes for sub panels, including 4411.13.90. (link: https://www.unisco.com/hts/44111390)

    Visit Resource

    Dimensions & Weight (Packaged)

    Minimum 150 sq ft, 20ft x 7.5ft area, 10ft height clearance. Allow 3ft access aisle. (link: https://www.unisco.com/resources)

    Visit Resource

    Handling Requirements

    Individually wrap sub panels in foam, use pallets, label 'FRAGILE - SUB PANEL'. Ensure 10ft forklift clearance and 12ft loading dock. (link: https://www.unisco.com/contact-us)

    Visit Resource

    Packaging Specs

    Protect sub panels with foam padding, pallets, and clear labeling. Avoid direct sunlight and ensure dry, ventilated storage. (link: https://www.unisco.com/resources)

    Visit Resource

    Accessorials

    Request climate-controlled storage, security monitoring, or inventory tracking for sub panels. (link: https://www.unisco.com/contact-us)

    Visit Resource

    Cost Drivers

    Factors include storage size, security measures, packaging materials, and logistics coordination for sub panel shipments. (link: https://www.unisco.com/contact-us)

    Visit Resource
    UNIS support representative

    Ready to ship?

    Get a free quote or start shipping your sub panel freight today.

    Shipping FAQ

    Common questions we get across freight uses.

    ← Back to Electrical Components