Rate Notice: 5.9% general rate increase Jan 1, 2026 — Learn More
    modified bitumen

    modified bitumen

    modified bitumen Freight

    About this Product

    Modified bitumen should be shipped in dry, ventilated conditions to prevent degradation. Ensure packaging includes protective padding and avoid direct sunlight exposure during transit.

    Product Specifications

    • Material: Bituminous material
    • Size Options: Standard rolls
    • Load Capacity: Varies by pallet
    • Coating: None
    • Applications: Sugar processing
    • NMFC Code: None (suggested)
    • Freight Class: suggested

    Note: All specifications listed are suggested values.

    Why UNIS?

    Modified bitumen requires dry, ventilated storage and protection from sunlight. UNIS is equipped to handle these conditions, ensuring safe and efficient transportation for this fragile material.

    Shipping Methods & Advantages

    LTL freight

    Best for 1–3 units or smaller batches that do not require a full truck.

    FTL freight

    Ideal for 5+ units or bulk shipments headed to large retail warehouses.

    Air freight

    Fastest option for urgent deliveries or time-sensitive placements.

    Reefer freight

    Recommended when the shipment includes temperature-sensitive contents.

    Reliable Transport

    Dedicated handling keeps fragile products secure throughout transit.

    Nationwide Network

    Coverage across major markets for consistent delivery windows.

    Timely Deliveries

    Optimized routing reduces delays and keeps inventory on schedule.

    Quality & Security

    Protective packaging and checks minimize damage risk.

    modified bitumen additional view

    Need to ship modified bitumen?

    Get a quote today and let UNIS handle your modified bitumen freight with safe, secure, and timely delivery.

    Handling & Compliance

    HTS Official Website

    For detailed customs regulations and HTS code information, visit the official HTS database.

    Visit Resource

    UNIS HTS Codes

    Review HTS codes specific to modified bitumen for compliance.

    Visit Resource

    Dimensions & Weight (Packaged)

    Storage requires a minimum 150 sq ft area with 12ft height clearance. Pallet spacing and airflow are critical for stability.

    Visit Resource

    Handling Requirements

    Store in dry, ventilated areas away from direct sunlight. Use protective padding and handle with care to prevent damage.

    Visit Resource

    Packaging Specs

    Palletize rolls with 4-inch foam/cardboard padding. Ensure shelving supports 3-pallet stacks and maintains 8ft height.

    Visit Resource

    Accessorials

    Require a 10ft-wide loading dock and 8ft-wide doors. Maintain 8ft clear aisles for forklift access.

    Visit Resource

    Cost Drivers

    Storage and handling logistics, including climate-controlled environments and secure transportation, impact overall costs.

    Visit Resource
    UNIS support representative

    Ready to ship?

    Get a free quote or start shipping your modified bitumen freight today.

    Shipping FAQ

    Common questions we get across freight uses.

    ← Back to Sugar Processing Input