Rate Notice: 5.9% general rate increase Jan 1, 2026 — Learn More
    Excavator Components

    Excavator Components

    Excavator Components Freight

    About this Product

    Excavator components require careful shipping to ensure durability and efficiency. Use dry storage with proper ventilation and protective padding to prevent damage during transit. Prioritize pallet racking and shelving for organized handling, and adhere to NMFC and HTS guidelines for compliance.

    Product Specifications

    • Material: Steel (suggested)
    • Size Options: Variable (suggested)
    • Load Capacity: High (suggested)
    • Coating: Galvanized (suggested)
    • Applications: Construction, mining, infrastructure
    • NMFC Code: 115425 (suggested)
    • Freight Class: 125 (suggested)

    Note: All specifications listed are suggested values.

    Why UNIS?

    Excavator components are best shipped in dry, ventilated environments with protective padding. UNIS handles these items efficiently using modular storage solutions that ensure durability and ease of handling during transit.

    Shipping Methods & Advantages

    LTL freight

    Best for 1–3 units or smaller batches that do not require a full truck.

    FTL freight

    Ideal for 5+ units or bulk shipments headed to large retail warehouses.

    Air freight

    Fastest option for urgent deliveries or time-sensitive placements.

    Reefer freight

    Recommended when the shipment includes temperature-sensitive contents.

    Reliable Transport

    Dedicated handling keeps fragile products secure throughout transit.

    Nationwide Network

    Coverage across major markets for consistent delivery windows.

    Timely Deliveries

    Optimized routing reduces delays and keeps inventory on schedule.

    Quality & Security

    Protective packaging and checks minimize damage risk.

    Excavator Components additional view

    Need to ship excavator components?

    Get a quote today and let UNIS handle your excavator components freight with safe, secure, and timely delivery.

    Handling & Compliance

    HTS Official Website

    Access official HTS classification details for international shipping requirements.

    Visit Resource

    UNIS HTS Codes

    Review HTS code 1806.20.20 for block-shaped components weighing 4.5 kg or more.

    Visit Resource

    Dimensions & Weight (Packaged)

    Ensure storage areas are 20ft x 10ft with 12ft clearance. Use pallet racking for bulk items and adjustable shelving for smaller parts.

    Visit Resource

    Handling Requirements

    Store in dry, ventilated spaces with level floors. Secure larger components with straps and use protective padding to prevent scratches and dents.

    Visit Resource

    Packaging Specs

    Use foam, bubble wrap, or cardboard for padding. Maintain 10ft aisles for forklift access and ensure overhead clearance for equipment maneuverability.

    Visit Resource

    Accessorials

    Plan for loading docks (12ft x 16ft) and warehouse doors (minimum 10ft wide) to optimize logistics.

    Visit Resource

    Cost Drivers

    Minimize costs with strategic storage layouts and efficient stock rotation. Prioritize proximity to service areas for faster response times.

    Visit Resource
    UNIS support representative

    Ready to ship?

    Get a free quote or start shipping your excavator components freight today.

    Shipping FAQ

    Common questions we get across freight uses.

    ← Back to Excavator Parts Storage