Rate Notice: 5.9% general rate increase Jan 1, 2026 — Learn More
    concrete flooring

    concrete flooring

    concrete flooring Freight

    About this Product

    Concrete flooring requires careful handling during shipping to maintain durability. Store in dry, ventilated environments on level surfaces, using pallets for stacking with a max of 4 pallets per layer. Wrap slabs in protective materials and avoid direct sunlight.

    Product Specifications

    • Material: Concrete
    • Size Options: Custom
    • Load Capacity: 5,000 lbs
    • Coating: None
    • Applications: Industrial floors, commercial buildings
    • NMFC Code: 103070 (suggested)
    • Freight Class: Class 95 (suggested)

    Note: All specifications listed are suggested values.

    Why UNIS?

    Concrete flooring demands robust storage solutions. UNIS is well-suited for handling its weight and ensuring secure, adaptable storage options with proper padding and stacking protocols.

    Shipping Methods & Advantages

    LTL freight

    Best for 1–3 units or smaller batches that do not require a full truck.

    FTL freight

    Ideal for 5+ units or bulk shipments headed to large retail warehouses.

    Air freight

    Fastest option for urgent deliveries or time-sensitive placements.

    Reefer freight

    Recommended when the shipment includes temperature-sensitive contents.

    Reliable Transport

    Dedicated handling keeps fragile products secure throughout transit.

    Nationwide Network

    Coverage across major markets for consistent delivery windows.

    Timely Deliveries

    Optimized routing reduces delays and keeps inventory on schedule.

    Quality & Security

    Protective packaging and checks minimize damage risk.

    concrete flooring additional view

    Need to ship concrete flooring?

    Get a quote today and let UNIS handle your concrete flooring freight with safe, secure, and timely delivery.

    Handling & Compliance

    HTS Official Website

    Access official HTS resources for classification guidelines. Link:

    Visit Resource

    UNIS HTS Codes

    Review HTS code 2517.10.00 for concrete aggregates. Link:

    Visit Resource

    Dimensions & Weight (Packaged)

    Minimum 150 sq ft storage area with 12ft height clearance. Ensure level floors and 10ft x 10ft clearance for forklifts. Link:

    Visit Resource

    Handling Requirements

    Store on level surfaces, use pallets for stacking (max 4 per layer), and wrap slabs in protective materials. Avoid direct sunlight and moisture exposure. Link:

    Visit Resource

    Packaging Specs

    Individually wrap slabs in cardboard or plastic, pad with foam/bubble wrap. Secure with pallets for stability. Link:

    Visit Resource

    Accessorials

    Require 12ft loading dock, 10ft double doors, and 8ft aisle widths for safe operations. Link:

    Visit Resource

    Cost Drivers

    Warehouse storage costs depend on space utilization, labor, and protective measures. Optimize with pallet systems and efficient layout. Link:

    Visit Resource
    UNIS support representative

    Ready to ship?

    Get a free quote or start shipping your concrete flooring freight today.

    Shipping FAQ

    Common questions we get across freight uses.

    ← Back to Flooring Storage