Rate Notice: 5.9% general rate increase Jan 1, 2026 — Learn More
    water lines

    water lines

    water lines Freight

    About this Product

    Water lines require careful shipping to prevent damage. Use dry, ventilated storage with padding and secure stacking. Proper handling ensures structural integrity and minimizes risk during transit.

    Product Specifications

    • Material: PVC
    • Size Options: 10-20ft
    • Load Capacity: 500 lbs
    • Coating: EPDM
    • Applications: Construction
    • NMFC Code: 34790 (suggested)
    • Freight Class: 120 (suggested)

    Note: All specifications listed are suggested values.

    Why UNIS?

    Water lines are best shipped in dry, ventilated environments with secure padding. UNIS ensures proper handling and storage conditions to maintain product integrity during transit.

    Shipping Methods & Advantages

    LTL freight

    Best for 1–3 units or smaller batches that do not require a full truck.

    FTL freight

    Ideal for 5+ units or bulk shipments headed to large retail warehouses.

    Air freight

    Fastest option for urgent deliveries or time-sensitive placements.

    Reefer freight

    Recommended when the shipment includes temperature-sensitive contents.

    Reliable Transport

    Dedicated handling keeps fragile products secure throughout transit.

    Nationwide Network

    Coverage across major markets for consistent delivery windows.

    Timely Deliveries

    Optimized routing reduces delays and keeps inventory on schedule.

    Quality & Security

    Protective packaging and checks minimize damage risk.

    water lines additional view

    Need to ship water lines?

    Get a quote today and let UNIS handle your water lines freight with safe, secure, and timely delivery.

    Handling & Compliance

    HTS Official Website

    Learn about HTS codes for water lines. Link

    Visit Resource

    UNIS HTS Codes

    Access HTS codes for water lines. Link

    Visit Resource

    Dimensions & Weight (Packaged)

    Minimum 100 sq ft per line set, 10ft x 10ft area, 8ft height clearance. Link

    Visit Resource

    Handling Requirements

    Use drop cloths, level floors, and secure padding. Avoid impacts and ensure proper load distribution. Link

    Visit Resource

    Packaging Specs

    Protect against spills with drop cloths. Ensure ventilation to prevent moisture buildup. Link

    Visit Resource

    Accessorials

    Require 12ft loading dock width and 10ft warehouse doors for efficient access. Link

    Visit Resource

    Cost Drivers

    Freight costs depend on storage size, stacking height, and handling requirements. Link

    Visit Resource
    UNIS support representative

    Ready to ship?

    Get a free quote or start shipping your water lines freight today.

    Shipping FAQ

    Common questions we get across freight uses.

    ← Back to Large Machinery Storage