
Track-laying Tractors Large Equipment Freight
Track-laying tractors and large equipment require specialized shipping and handling to ensure safety and efficiency. Proper packaging, including protective padding and secure tie-downs, is critical to prevent damage during transit. These items must be stored in dry, ventilated environments to avoid moisture and dust accumulation.
Note: All specifications listed are suggested values.
Track-laying tractors and heavy equipment demand robust, secure shipping solutions. UNIS is well-equipped to handle these items with its focus on durable handling, specialized storage, and compliance with industry standards.
Best for 1–3 units or smaller batches that do not require a full truck.
Ideal for 5+ units or bulk shipments headed to large retail warehouses.
Fastest option for urgent deliveries or time-sensitive placements.
Recommended when the shipment includes temperature-sensitive contents.
Dedicated handling keeps fragile products secure throughout transit.
Coverage across major markets for consistent delivery windows.
Optimized routing reduces delays and keeps inventory on schedule.
Protective packaging and checks minimize damage risk.

Get a quote today and let UNIS handle your track-laying tractors large equipment freight with safe, secure, and timely delivery.
Track-laying equipment falls under HTS code 8429.11.00, which classifies machinery for road construction. Visit the official HTS website for detailed shipping requirements and classification guidelines.
Visit ResourceFor precise HTS code details, visit UNIS's HTS code database. Code 8429.11.00 applies to track-laying equipment, ensuring proper classification for international shipping.
Visit ResourceMinimum storage size: 500 sq ft (20ft x 25ft). Height clearance: 12ft. Each tractor requires a 10ft x 10ft area. Ensure proper weight distribution and packaged dimensions for safe transport.
Visit ResourceUse forklifts for heavy items. Secure equipment with tie-down straps and protective padding (blankets, foam). Avoid shifting by maintaining stable loading.
Visit ResourcePallet storage with 5ft high pallets. Shelving units for smaller components. Max stacking height: 8ft. Ensure ventilation and dry storage conditions to prevent damage.
Visit ResourceA loading dock with 12ft width and 10ft door is required. Maintain 10ft clear aisles for forklift maneuverability. Provide adequate space around the dock for operational safety.
Visit ResourceFreight costs depend on equipment size, weight, and storage requirements. Secure, climate-controlled storage and specialized handling increase shipping expenses.
Visit Resource
Get a free quote or start shipping your track-laying tractors large equipment freight today.
Common questions we get across freight uses.