Rate Notice: 5.9% general rate increase Jan 1, 2026 — Learn More
    Concrete Saw

    Concrete Saw

    concrete saw Freight

    About this Product

    Concrete saws require dry, well-ventilated shipping environments to prevent rust and damage. Proper packaging with protective mats and pallets ensures safe transit.

    Product Specifications

    • Material: Concrete
    • Size Options: Varies
    • Load Capacity: 500 lbs
    • Applications: Construction, demolition
    • NMFC Code: 103070 (suggested)
    • Freight Class: Class 125 (suggested)

    Note: All specifications listed are suggested values.

    Why UNIS?

    Concrete saws are best shipped in secure, climate-controlled environments. UNIS handles heavy-duty tools with specialized packaging and handling protocols to ensure damage-free transit.

    Shipping Methods & Advantages

    LTL freight

    Best for 1–3 units or smaller batches that do not require a full truck.

    FTL freight

    Ideal for 5+ units or bulk shipments headed to large retail warehouses.

    Air freight

    Fastest option for urgent deliveries or time-sensitive placements.

    Reefer freight

    Recommended when the shipment includes temperature-sensitive contents.

    Reliable Transport

    Dedicated handling keeps fragile products secure throughout transit.

    Nationwide Network

    Coverage across major markets for consistent delivery windows.

    Timely Deliveries

    Optimized routing reduces delays and keeps inventory on schedule.

    Quality & Security

    Protective packaging and checks minimize damage risk.

    Concrete Saw additional view

    Need to ship concrete saw?

    Get a quote today and let UNIS handle your concrete saw freight with safe, secure, and timely delivery.

    Handling & Compliance

    HTS Official Website

    For details on import regulations and duty rates.

    Visit Resource

    UNIS HTS Codes

    For HTS code 2517.10.00, which classifies crushed stone used in concrete aggregates.

    Visit Resource

    Dimensions & Weight (Packaged)

    Minimum 150 sq ft storage space required. Height clearance: 9 feet. Floor must be level and debris-free.

    Visit Resource

    Handling Requirements

    Use protective mats/pallets to prevent damage. Avoid direct sunlight. Secure with straps to prevent movement during transit.

    Visit Resource

    Packaging Specs

    Pallet storage recommended (48" height). Shelving units up to 72" height. Stack no more than two saws per pallet.

    Visit Resource

    Accessorials

    Loading dock width: 12 feet. Door width: 8 feet. Clear aisle space: 8 feet for forklift operation.

    Visit Resource

    Cost Drivers

    Freight class and dimensional weight impact shipping costs. Optimize packaging to reduce costs.

    Visit Resource
    UNIS support representative

    Ready to ship?

    Get a free quote or start shipping your concrete saw freight today.

    Shipping FAQ

    Common questions we get across freight uses.

    ← Back to Power Tools