Rate Notice: 5.9% general rate increase Jan 1, 2026 — Learn More
    Rig Installation

    Rig Installation

    Rig Installation Freight

    About this Product

    Rig Installation components require careful shipping and handling to ensure durability during transit. Use dry storage with proper padding and pallet racking to prevent damage. Prioritize secure packaging and organized zones for efficient handling.

    Product Specifications

    • Material: Steel (suggested)
    • Size Options: Custom (suggested)
    • Load Capacity: 5,000 lbs (suggested)
    • Coating: Anti-corrosive (suggested)
    • Applications: Offshore drilling, marine structures
    • NMFC Code: 17350 (suggested)
    • Freight Class: 125 (suggested)

    Note: All specifications listed are suggested values.

    Why UNIS?

    Rig Installation components are best shipped in modular storage units that allow flexible configuration and secure handling. These units provide optimal airflow, accessibility, and protection for sensitive equipment during transport and storage.

    Shipping Methods & Advantages

    LTL freight

    Best for 1–3 units or smaller batches that do not require a full truck.

    FTL freight

    Ideal for 5+ units or bulk shipments headed to large retail warehouses.

    Air freight

    Fastest option for urgent deliveries or time-sensitive placements.

    Reefer freight

    Recommended when the shipment includes temperature-sensitive contents.

    Reliable Transport

    Dedicated handling keeps fragile products secure throughout transit.

    Nationwide Network

    Coverage across major markets for consistent delivery windows.

    Timely Deliveries

    Optimized routing reduces delays and keeps inventory on schedule.

    Quality & Security

    Protective packaging and checks minimize damage risk.

    Rig Installation additional view

    Need to ship rig installation?

    Get a quote today and let UNIS handle your rig installation freight with safe, secure, and timely delivery.

    Handling & Compliance

    HTS Official Website

    Learn about HTS code 9902.15.41: Used compression-ignition internal combustion piston engines for vehicle installation.

    Visit Resource

    UNIS HTS Codes

    Access detailed HTS code 9902.15.41 information for compliance and shipping requirements.

    Visit Resource

    Dimensions & Weight (Packaged)

    Minimum 200 sq ft (15ft x 13ft) storage area with 12ft height clearance. Ensure proper weight distribution on pallets and shelving.

    Visit Resource

    Handling Requirements

    Use foam padding, bubble wrap, or cardboard for minor impact protection. Secure large components with straps. Maintain 10ft aisles for forklift access.

    Visit Resource

    Packaging Specs

    Pallet storage recommended for larger components. Use 48" high shelving for smaller tools. Ensure shelving weight capacity matches stored items.

    Visit Resource

    Accessorials

    Require 12ft wide loading dock with 10ft clearance on either side. Provide forklift or pallet jack access for loading/unloading.

    Visit Resource

    Cost Drivers

    Logistics efficiency is key for managing Rig Installation inventory. Optimize storage layout and packaging to reduce handling costs and delays.

    Visit Resource
    UNIS support representative

    Ready to ship?

    Get a free quote or start shipping your rig installation freight today.

    Shipping FAQ

    Common questions we get across freight uses.

    ← Back to Subsea Equipment Storage